THE CONDO BOOK PROJECT

Huron

29 Huron Street, Brooklyn, NY 11222

Overview

A 171-residence, two-tower condo at the end of Huron Street on the Greenpoint waterfront, from QBDK Huron LLC and Morris Adjmi Architects. It has an indoor pool and attended parking, and owners must maintain a public waterfront walkway.

  • Address: 29 Huron Street (a/k/a 161 West Street), Greenpoint, Brooklyn
  • Plan: CD220064, accepted for filing in September 2022
  • Building: 13 stories above grade in two towers, with no below-grade levels
  • Residences: 171, including the resident manager's unit. Studios of about 500 square feet up to three-bedrooms of about 1,770 square feet, plus a held-back four-bedroom penthouse of about 2,340 square feet. About 67 homes have a terrace or balcony, up to about 1,560 square feet.
  • Other units: one non-residential unit of about 5,100 square feet, offered at $6 million, with no use named yet
  • Parking and storage: 95 parking licenses at $100,000 each and 104 storage lockers at $20,000 to $40,000, all sold as licenses
  • First offering: 154 residences at about $233.5 million in total, from $675,000 to $2.995 million (sponsor offering prices, not sales). 17 homes, including all the penthouse-floor units, were marked "Reserved."

By size, the priced homes broke down roughly like this:

  • Studios (21): about 500 to 540 square feet, $675,000 to $900,000.
  • One-bedrooms (57): about 630 to 900 square feet, $875,000 to $1.3 million.
  • Two-bedrooms (47): about 820 to 1,340 square feet, $1.25 million to $2.85 million.
  • Three-bedrooms (29): about 1,370 to 1,770 square feet, about $2.1 million to $3 million.

Compare

FigureThis building1One Boerum2138 units · 3.2 miaccepted 2020The Brooklyn Tower3149 units · 3.1 miaccepted 2021
Common ChargesPer Square Foot / Month$1.19In line$0.87$1.59
Average Offering PricePer Apartment$1.6MLowest$1.95M$2.56M
Average PricePer Square Foot$1,639In line$1,624$2,246
Property TaxesPer Square Foot / Month$0.96Below peers$1.13$1.10
Average Unit SizeSquare Feet1,005 SFSmaller1,201 SF1,139 SF

Free Account

See the Full Comp

Unit mix, closings, budgets, finishes and the team, against One Boerum and The Brooklyn Tower, cited to the offering plans. No credit card required.

Create a free account
How We Got This
  • Comps: the closest Brooklyn plans on size, $/SF and launch date, within 2 miles when possible.
  • Figures: each building's own offering plan, filed with the NY Attorney General. Nothing is estimated.
  • Checked: a price list publishes only when its math adds up, and building pages cite the plan pages.
  • Labels: In line is between the comps; Below/Above peers is past both by up to 15%; Lowest/Highest by more.

Closings Pro

Homes closed98% of the homes in Schedule A168 of 171
Closing prices vs. Schedule A158 homes: $263,785,222 at closing against $253,234,000 in Schedule A (p. 67, p. 68, p. 69)+4.2%
Average closing price168 homes, on their Schedule A square feet$1,753 / SF
Closingsfirst and latest recordedFeb 15, 2024 – Jul 30, 2026

Sales recorded with the Department of Finance (ACRIS) through Sep 30, 2026: deeds, or transfer tax filings for a building on leased land, of $10,000 or more. A home's first sale since the plan was filed is the sponsor's closing; resales aren't counted. Closing prices are compared with the same home's Schedule A price, as first offered (or, for a home the plan listed without a price, the amendment that priced it); a deed covering more than one home isn't compared. Amendments often change prices before a home closes, and a deed that includes parking or storage counts its full price. ACRIS records a sale weeks after closing, so recent contracts don't appear yet. Every building's sales.

All 168 closings
HomeRecordedClosing priceSchedule ADifference
4A WFeb 15, 2024$1,322,500$1,325,000 p. 67−0.2%
4D WFeb 22, 2024$950,000$925,000 p. 67+2.7%
5E EFeb 22, 2024$1,225,000$1,200,000 p. 68+2.1%
6E WFeb 27, 2024$1,430,000$1,300,000 p. 67+10%
6D EMar 4, 2024$970,000$950,000 p. 69+2.1%
5C EMar 5, 2024$1,610,000$1,540,000 p. 68+4.5%
5E WMar 5, 2024$1,335,000$1,275,000 p. 67+4.7%
5A EMar 7, 2024$745,000$775,000 p. 68−3.9%
5F EMar 7, 2024$1,725,000$1,695,000 p. 68+1.8%
5J EMar 7, 2024$1,500,000$1,475,000 p. 68+1.7%
4F WMar 8, 2024$1,765,000$1,750,000 p. 67+0.9%
4F EMar 13, 2024$2,501,643$2,350,000 p. 68+6.5%
6A WMar 13, 2024$1,365,000$1,385,000 p. 67−1.4%
6F EMar 15, 2024$1,835,000$1,735,000 p. 69+5.8%
6J EMar 15, 2024$1,550,000$1,515,000 p. 69+2.3%
4C EMar 18, 2024$1,622,396$1,500,000 p. 68+8.2%
6C WMar 18, 2024$2,915,000$2,745,000 p. 67+6.2%
4E EMar 19, 2024$920,000$885,000 p. 68+4%
5B WMar 19, 2024$2,890,000$2,700,000 p. 67+7%
4C WMar 20, 2024$2,834,596$2,645,000 p. 67+7.2%
5D WMar 20, 2024$968,000$950,000 p. 67+1.9%
5K EMar 22, 2024$920,000$900,000 p. 68+2.2%
6E EMar 25, 2024$1,250,000$1,225,000 p. 69+2%
5F WMar 27, 2024$1,805,000$1,780,000 p. 67+1.4%
7E EMar 29, 2024$985,000$950,000 p. 69+3.7%
4H WApr 1, 2024$712,000$695,000 p. 67+2.4%
4E WApr 3, 2024$1,275,000$1,250,000 p. 67+2%
6F WApr 3, 2024$1,885,000$1,810,000 p. 67+4.1%
7B WApr 4, 2024$2,905,763$2,850,000 p. 67+2%
4D EApr 5, 2024$925,000$900,000 p. 68+2.8%
8C EApr 9, 2024$1,731,500$1,675,000 p. 69+3.4%
6C EApr 10, 2024$1,613,926$1,580,000 p. 69+2.1%
8A WApr 11, 2024$810,000$795,000 p. 67+1.9%
5A WApr 12, 2024$1,455,000$1,355,000 p. 67+7.4%
7J EApr 12, 2024$1,580,000$1,555,000 p. 69+1.6%
8J EApr 15, 2024$1,720,000$1,595,000 p. 69+7.8%
5D EApr 16, 2024$950,000$925,000 p. 68+2.7%
3B WApr 17, 2024$2,690,000$2,595,000 p. 67+3.7%
3D WApr 17, 2024$1,250,000$1,075,000 p. 67+16.3%
7D WApr 17, 2024$1,050,000$985,000 p. 67+6.6%
2H WApr 18, 2024$1,280,000$1,250,000 p. 67+2.4%
3D EApr 19, 2024$1,050,000$975,000 p. 68+7.7%
3G EApr 22, 2024$1,050,000$1,050,000 p. 680%
2J WApr 23, 2024$1,832,850$1,750,000 p. 67+4.7%
3F WApr 23, 2024$2,395,000$2,200,000 p. 67+8.9%
2D WApr 24, 2024$3,229,570$2,995,000 p. 67+7.8%
2G EApr 24, 2024$1,231,734$1,075,000 p. 68+14.6%
2H EApr 24, 2024$1,200,000$1,100,000 p. 68+9.1%
2I EApr 25, 2024$1,135,000$1,100,000 p. 68+3.2%
6D WApr 25, 2024$1,070,000$975,000 p. 67+9.7%
8F WApr 25, 2024$2,335,000$2,115,000 p. 67+10.4%
2F WApr 26, 2024$1,196,444$1,175,000 p. 67+1.8%
3C WApr 26, 2024$3,103,080$2,750,000 p. 67+12.8%
3K EApr 26, 2024$900,000$900,000 p. 680%
7A WApr 26, 2024$760,000$770,000 p. 67−1.3%
8B WApr 26, 2024$2,220,075$2,050,000 p. 67+8.3%
2F EApr 29, 2024$1,165,000$1,125,000 p. 68+3.6%
2J EApr 29, 2024$2,450,807$2,250,000 p. 68+8.9%
3E WMay 6, 2024$1,085,000$1,025,000 p. 67+5.9%
2G WMay 8, 2024$1,191,353$1,100,000 p. 67+8.3%
2E EMay 9, 2024$1,280,000$1,250,000 p. 68+2.4%
3H WMay 10, 2024$792,894$675,000 p. 67+17.5%
7K EMay 10, 2024$960,000$950,000 p. 69+1.1%
8D WMay 10, 2024$1,085,000$1,010,000 p. 67+7.4%
2I WMay 15, 2024$1,330,000$1,150,000 p. 67+15.7%
8C WMay 15, 2024$3,252,000$2,845,000 p. 67+14.3%
2D EMay 16, 2024$1,251,511$1,100,000 p. 68+13.8%
9J EMay 16, 2024$1,675,000$1,635,000 p. 69+2.4%
5C WMay 20, 2024$3,310,000$2,695,000 p. 67+22.8%
10C EMay 20, 2024$1,915,000$1,740,000 p. 69+10.1%
10D WMay 22, 2024$1,130,000$1,060,000 p. 68+6.6%
10J EMay 22, 2024$1,725,000$1,675,000 p. 69+3%
8F EMay 23, 2024$2,480,000$2,390,000 p. 69+3.8%
9A WMay 23, 2024$885,000$820,000 p. 68+7.9%
10C WMay 23, 2024$3,200,000$2,945,000 p. 68+8.7%
3B EMay 29, 2024$1,250,000$1,250,000 p. 680%
9D WMay 29, 2024$1,200,000$1,035,000 p. 68+15.9%
9C EMay 30, 2024$1,785,000$1,700,000 p. 69+5%
9D EMay 30, 2024$1,040,000$1,025,000 p. 69+1.5%
10B WMay 30, 2024$2,345,000$2,130,000 p. 68+10.1%
3E EMay 31, 2024$1,320,000$1,275,000 p. 68+3.5%
6H WMay 31, 2024$760,000$745,000 p. 67+2%
9F WMay 31, 2024$2,380,000$2,155,000 p. 68+10.4%
9C WJun 3, 2024$3,075,208$2,895,000 p. 68+6.2%
8K EJun 5, 2024$980,000$970,000 p. 69+1%
10D EJun 6, 2024$1,065,000$1,050,000 p. 69+1.4%
8B EJun 7, 2024$1,425,000$1,415,000 p. 69+0.7%
9B WJun 7, 2024$2,134,125$2,090,000 p. 68+2.1%
4B EJun 12, 2024$1,275,000$1,275,000 p. 680%
5B EJun 12, 2024$1,350,000$1,310,000 p. 68+3.1%
10F EJun 12, 2024$2,470,000$2,470,000 p. 690%
7B EJun 13, 2024$1,380,000$1,380,000 p. 690%
7C EJun 17, 2024$1,885,000$1,650,000 p. 69+14.2%
6B EJun 18, 2024$1,345,000$1,345,000 p. 680%
3J EJun 25, 2024$1,300,000$1,225,000 p. 68+6.1%
5H WJun 26, 2024$740,000$720,000 p. 67+2.8%
3I EJun 27, 2024$2,675,000$2,650,000 p. 68+0.9%
4G WJul 2, 2024$1,100,000$1,100,000 p. 670%
10B EJul 2, 2024$1,485,000$1,485,000 p. 690%
9G WJul 10, 2024$1,225,000$1,225,000 p. 680%
3A EJul 11, 2024$725,000$725,000 p. 680%
4B WJul 11, 2024$3,301,038$2,650,000 p. 67+24.6%
10G WJul 11, 2024$1,250,000$1,250,000 p. 680%
7H WJul 15, 2024$850,000$750,000 p. 67+13.3%
4K EJul 16, 2024$940,000$875,000 p. 68+7.4%
7F WJul 17, 2024$2,295,000$2,075,000 p. 67+10.6%
8H WJul 18, 2024$800,000$775,000 p. 67+3.2%
2A EAug 22, 2024$2,826,369$2,750,000 p. 68+2.8%
6B WAug 23, 2024$3,325,000$2,750,000 p. 67+20.9%
3H EAug 26, 2024$1,060,000$1,025,000 p. 68+3.4%
7C WAug 29, 2024$4,210,000——
5G WSep 3, 2024$1,125,000$1,125,000 p. 670%
11B WSep 4, 2024$3,537,587$3,800,000 Amendment 9, p. 6−6.9%
10A WSep 5, 2024$895,000$845,000 p. 68+5.9%
11A ESep 6, 2024$2,490,000$2,375,000 p. 69+4.8%
12C ESep 11, 2024$2,741,252$2,755,000 p. 69−0.5%
12A WSep 16, 2024$3,419,109$3,685,000 Amendment 9, p. 6−7.2%
2B ESep 17, 2024$2,258,424$2,050,000 p. 68+10.2%
8D ESep 20, 2024$1,015,000$1,000,000 p. 69+1.5%
3G WSep 23, 2024$1,150,000$1,150,000 p. 670%
4J ESep 25, 2024$1,785,000$1,750,000 p. 68+2%
9E ESep 26, 2024$1,035,000$999,000 p. 69+3.6%
2C WOct 1, 2024$3,117,234$2,850,000 p. 67+9.4%
8E EOct 2, 2024$1,010,000$975,000 p. 69+3.6%
PHG EOct 11, 2024$3,250,000——
11C EOct 16, 2024$3,130,000$3,140,000 Amendment 9, p. 7−0.3%
9K EOct 22, 2024$990,000$995,000 p. 69−0.5%
PHA WOct 22, 2024$5,700,000——
7D EOct 25, 2024$990,000$975,000 p. 69+1.5%
10H WOct 28, 2024$880,000$825,000 p. 68+6.7%
6G WNov 5, 2024$1,130,000$1,150,000 p. 67−1.7%
2C ENov 13, 2024$861,095$800,000 p. 68+7.6%
10E ENov 18, 2024$1,085,000$1,025,000 p. 69+5.9%
9H WNov 21, 2024$865,274$800,000 p. 68+8.2%
9B EDec 2, 2024$1,460,000$1,450,000 p. 69+0.7%
11A WDec 10, 2024$3,790,415——
12A EJan 7, 2025$2,255,091$2,150,000 p. 69+4.9%
11B EJan 15, 2025$3,365,000$3,800,000 Amendment 9, p. 6−11.4%
7G WJan 17, 2025$1,175,000$1,175,000 p. 670%
8G WJan 21, 2025$1,250,913$1,200,000 p. 67+4.2%
4A EFeb 24, 2025$760,000$750,000 p. 68+1.3%
2K WMar 20, 2025$1,950,000$1,850,000 p. 67+5.4%
10F WMar 25, 2025$2,475,000$2,205,000 p. 68+12.2%
10K EApr 10, 2025$1,050,274$1,020,000 p. 69+3%
6A EApr 24, 2025$800,000$800,000 p. 680%
2K EMay 1, 2025$2,600,913$2,395,000 p. 68+8.6%
12B EMay 9, 2025$3,127,042$3,730,000 Amendment 9, p. 7−16.2%
PHE EMay 12, 2025$2,601,916——
7A EMay 19, 2025$830,091$825,000 p. 69+0.6%
8A EJun 5, 2025$860,183$850,000 p. 69+1.2%
9A EJul 9, 2025$883,000$875,000 p. 69+0.9%
12B WJul 21, 2025$3,845,000$3,730,000 Amendment 9, p. 6+3.1%
3F EJul 23, 2025$2,185,000$2,025,000 p. 68+7.9%
PHK EAug 25, 2025$2,372,500——
PHF EOct 1, 2025$3,395,000——
12C WOct 23, 2025$2,715,000——
11D WOct 27, 2025$2,095,000$2,250,000 p. 68−6.9%
9F ENov 10, 2025$2,465,000$2,430,000 p. 69+1.4%
10A ENov 25, 2025$885,000$900,000 p. 69−1.7%
7F EJan 16, 2026$2,345,000$2,350,000 p. 69−0.2%
12D WJan 30, 2026$2,040,000$2,100,000 p. 68−2.9%
11D EMar 6, 2026$2,260,000$2,350,000 p. 69−3.8%
11C WMar 17, 2026$2,815,365$2,650,000 p. 68+6.2%
3C EMar 25, 2026$1,980,000$1,950,000 p. 68+1.5%
12D EMay 21, 2026$2,236,000$2,125,000 p. 69+5.2%
PHD WMay 28, 2026$1,818,000——
2A WJun 22, 2026$2,275,000$2,250,000 p. 67+1.1%
PHB WJul 30, 2026$2,945,000——

Pro

Closings are for subscribers

Every home's recorded closing price against its Schedule A price, with the ACRIS document and the plan page.

Subscribe to seeAlready a member? Sign in

Budget

What It Costs to Run

The sponsor projected a first-year budget (October 2023 to September 2024) of about $2.78 million. The residential side carries about $2.76 million, and parking and storage fees cover about $312,000 of that. Here's how that works out in monthly common charges, per Schedule A:

  • About $530 to $620 a month for studios.
  • About $680 to $1,000 a month for one-bedrooms.
  • About $920 to $1,890 a month for two-bedrooms.
  • About $1,550 to $2,150 a month for three-bedrooms, and about $3,350 for the held-back four-bedroom penthouse.

First-year taxes run about $430 to $1,740 a month for the priced homes. There's no residential tax abatement. Only the commercial unit expects an ICAP break.

Notable lines:

  • Staff: about $1.1 million.
  • Service contracts: about $514,000, including about $246,000 for the parking operator, $125,000 for the amenity provider and $40,000 for window washing. The elevator contract is free in year one and $45,600 in year two (see elevator maintenance costs).
  • Utilities: about $330,000 for common electricity, $93,000 for water and sewer for the homes and common areas, and $53,000 for gas.
  • Insurance: $307,000, including flood coverage.
  • Management fee: $87,000 to FirstService Residential, on a one-year term that then runs month to month.
  • Resident manager's unit: about $28,000 a year for its common charges, taxes and utilities.

Good to know: you'll pay one month of common charges into working capital and another month into the reserve fund at closing. If buyers' reserve contributions fall short in the first two years, the sponsor fills the gap and gets repaid from later contributions (see condo reserve funds). For why budgets vary, see why operating costs differ and our common charge benchmarks.

From our research: The Sponsor's Condo-Creation Fee in NYC · NYC Condo Insurance Costs Are Rising · Condo Supplies Cost per Unit, by Size

The Building

Finishes

The architect's description gives one finish schedule, with appliances sized by home (compare with our NYC condo finishes guide).

Kitchen

  • All-Miele appliances with gas cooktops: 24-inch in studios and one-bedrooms, 30-inch five-burner in two- and three-bedrooms, and 36-inch in the four-bedroom.
  • Miele wall ovens (a speed oven in studios), Miele microwaves in two-bedrooms and up, and panel-ready Miele refrigerators and dishwashers. Studios get a freestanding stainless refrigerator.
  • Three- and four-bedrooms add an XO wine fridge. The four-bedroom also gets a built-in Miele coffee machine.
  • Faber insert hoods. Most recirculate, but homes on floor 13 vent out (see gas vs. induction).
  • Painted lacquer cabinets, a stained oak veneer island where there is one, stone slab counters and a matte black Signature Plumbing faucet.

Baths

  • Primary bath: stone tile floors, a stone shower, porcelain wainscot and a lacquer vanity on powder-coated metal legs.
  • Fixtures: matte black Signature Plumbing faucets, shower heads and controls, Porcelanosa Noken toilets and steel enamel alcove tubs. The four-bedroom penthouse gets a freestanding Kaldewei tub and a rain shower.

See how these names rank in our bathroom brands guide.

Floors, Ceilings and Windows

  • Engineered European oak planks, 7 inches wide, glued down.
  • Ceilings of about 8 feet 6 inches to 14 feet 9 inches. Kitchens, halls and baths may be lower.
  • Thermally broken aluminum windows and window walls with low-E insulated glass and trickle vents. Screens aren't provided.
  • Terraces and balconies are finished in precast concrete pavers on pedestals.

Laundry, Heating and Cooling

  • Every home gets a Bosch washer and dryer. A common laundry room on the ground floor has two heavy-duty washers and dryers, paid by card.
  • LG variable refrigerant flow (VRF) systems heat and cool each home, with two condensing units per floor (see how NYC condos heat and cool).
  • Hot water comes from central gas heaters in each tower (see condo hot water heaters).
  • Each home has its own electric meter, and that includes the power for the heating and cooling.

Amenities, Staffing & Transportation

For a building this size, the amenity list is long and mostly on the ground floor (compare with amenities by building size).

Ground Floor

  • An indoor pool about 14 feet 8 inches by 50 feet, 3.5 to 4 feet deep, with men's and women's locker rooms and a shared sauna.
  • An unattended exercise room and a separate exercise studio.
  • A lounge with a TV, a dining room with an ethanol fireplace, a library and workspace, and a dog wash.
  • Two bike rooms (one per tower) with at least 87 spaces and a repair station, first come, first served.

Floor 2 and the Roofs

  • A teen lounge and a kids' playroom on Floor 2.
  • A landscaped Floor 2 terrace with lounge areas and playground equipment.
  • Roof terraces on both towers, with lounge seating and gas grills.

Good to know: the budget sets aside $125,000 for an amenity service provider. Amenities may not open until about 12 months after the first closing, and the board can charge usage fees and require a chaperone for kids on the terraces.

Staffing and Services

A lobby attendant is on duty 24/7, and a live-in resident manager supervises the staff. The plan says the staff will be non-union, paid at or above state minimum wage. The staff table in Schedule B didn't come through in our copy of the plan, so we can't list headcounts. Payroll and benefits come to about $1.1 million, and that includes cleaning and snow removal on the public walkway. There are two passenger elevators per tower, a package room with an overflow room, and an audio-only intercom. Our doorman cost guide puts these numbers in context.

Tip: until occupancy builds, staff hours and duties may be reduced. The plan only guarantees that the lobby is attended 24/7 from the first closing.

Transportation

  • Subway: 8 min walk to Greenpoint Av G; Nassau Av G, 18 min

Fine Print

What's Specific to It

  • Two towers, one condo: 81 homes in the West Tower and 90 in the East Tower, on floors 2 through PH. The 13th floor is called the penthouse floor.
  • A public walkway owners maintain: a waterfront public access area of about 4,500 square feet runs along the East River west of the building. Once the condo forms, its board must maintain and repair it under a city agreement.
  • A real reserve fund: a 30-year reserve study puts future repair and replacement costs at about $22.9 million. The plan funds $175,000 in year one, rising about 10% a year.
  • Attended parking by license: 95 unassigned spaces on the ground floor, each license $100,000 plus $225 a month. An attendant parks the cars.
  • A cleaned-up industrial site: the lot was once a metal manufacturer and a lithography plant. Vapor-control systems with rooftop blowers will run continuously, and the condo must file yearly reports to the city.
  • Owners chip in for the super's apartment: at closing, each buyer pays a share of the board's purchase of unit 3A for the resident manager.

The Huron sits at the end of Huron Street in Greenpoint, with West Street to its east and the East River to its west. The plan names the Greenpoint Avenue G station as one of the closest subway stops. Its offering plan tells you what's in each home, what the building runs on and what it should cost.

Fine Print Worth Knowing

  • Taxes will rise: first-year taxes are partly based on the unfinished building. Once it's assessed as complete, the plan estimates about $2.96 million a year for all units, about 46% more than the first-year total in Schedule A.
  • Flood zone: the site is in FEMA Zone AE, and the ground floor sits below the design flood elevation. The plan won't promise that parking, storage or ground-floor spaces stay dry (see condo insurance).
  • Environmental controls: vapor barriers and two depressurization systems stay in place, and residual soil can't be used for vegetable gardens. Yearly engineer certifications are expected to cost about $6,600.
  • The waterfront walkway: the public has a permanent right to use it. The board must post and renew security with the Parks Department every five years, and a lapse can cost $1,000 a day. The condo also owns the north half of Huron Street out front, which the city treats as a public street.
  • The commercial unit: its use isn't known yet. Its owner can put up signs, change its storefront and use the sidewalk for seating, and residents have no say.
  • Resident manager's unit: buyers pay a share of the board's purchase of unit 3A, plus a share of about $50,000 in closing costs for it. Most of the plan lists the price as $1.275 million, but one section says $1.225 million.
  • Resale and sponsor rights: you can't list your home for sale for 12 months after the first closing without the sponsor's consent. The sponsor can rent unsold homes and only has to sell the 15% (26 homes) needed to declare the plan effective.
  • Licenses, not deeds: parking spaces and storage lockers are licenses tied to owning a home here, and the sponsor keeps the sale proceeds.

Team

  • Sponsor: QBDK Huron LLC. Its principals, Amir Setayesh, Anoop Rustgi and Jared White, are executives at Quadrum Global.
  • Architect: Morris Adjmi Architects
  • Structural engineer: WSP Group
  • MEP engineer: MG Engineering
  • Managing agent and budget expert: FirstService Residential
  • Selling agent: Serhant LLC
  • Sponsor's counsel: Starr Associates (also escrow agent)
  • Real estate tax counsel: Korngold Powers. Herrick, Feinstein handles the ICAP opinion.
  • Reserve study: Strategic Inspections
  • Construction lender: 1 Huron Lender 1 LLC, with mezzanine financing from 1 Huron Lender 2 LLC

The plan doesn't name an interior designer.

Nearby

FAQ

Does The Huron have a pool?

Yes. There's an indoor pool about 50 feet long on the west side of the ground floor, with men's and women's locker rooms and a shared sauna. It's for residents and their accompanied guests.

Does The Huron have parking?

Yes, 95 unassigned spaces on the ground floor, sold as $100,000 licenses with a $225 monthly fee in year one. An attendant parks the cars, except in the ADA van space, and you can only hold a license while you own a home in the building.

Does The Huron have a reserve fund?

Yes. A 30-year study estimates about $22.9 million in future repair and replacement costs. The fund starts at $175,000 in year one, paid mostly by buyers' one-month contributions at closing, and the budget line is set to rise about 10% a year.

Where this comes from: the building's offering plan (CD220064) as filed with the New York Attorney General, including its Special Risks, Description of Property and Improvements, Schedule A, Schedules B and B-1, Reserve Fund, and Identity of Parties. Prices are the sponsor's offering prices, not sales, and budget figures are the sponsor's first-year projections. Later amendments may change them. Updated October 2026.